9,000 m² new building
Warehouse concept from Schulte impresses at Liebherr-Logistics
Liebherr-Logistics built a new warehouse at the Oberopfingen site. Schulte equipped this with a complete package: Within a short space of time, pallet, cantilever and shelving racks were installed in all three sections of the new building.
Liebherr-Logistics GmbH is a division of the Liebherr Group. LGG needed additional storage space at short notice for 2024. The requirements: In the three-part warehouse built for this purpose, a wide variety of goods from excavator parts weighing several tons to 1g light sealing rings are to be stored and picked. LGG opted for a warehouse concept from Schulte for this purpose.
Support from planning to after-sales
"Schulte has assured us that we will have exactly one point of contact from the planning phase through to implementation and after-sales. I don't know where else you can find that these days - it's an absolutely unique selling point that won us over," says Bianca Dreher, Project Planner Logistics at LGG, explaining the decision in favor of Schulte. "And the contact person was really available to us at all times. Minor or last-minute questions were clarified immediately on the phone, which was great."
Reach your goal with three shelf types
To meet the complex demands on the warehouse, the Schulte team developed a solution with three different types of shelving. The new shelving system is over seven meters high and offers plenty of space for small and very small parts with over 20 levels at different heights.
Schulte installed over 10,000 Multiplus shelves with the new ML50 multifunctional upright. The special feature: the shelving racking system can be automated if required. In addition, pallet racks were installed that offer storage space for up to 3,780 pallets at a height of up to 7.5 meters. The dimensions of the individual storage locations were planned together with the customer so that a suitable rack location can be found for every type of goods.
The third component in the storage solution is over 300 meters of cantilever racking. These can be used to store and transfer bulky and heavy goods. Together with the other rack types, they ensure flexible storage and fast order picking.