Optimized spare parts supplyHub for spare parts: KION Regional Distribution Center Central Europe opened
In order to further shorten delivery times and ensure delivery availability of almost 100 percent in the future, Linde Material Handling has built a new, larger spare parts distribution center equipped with modern technology at its existing site in Kahl am Main.
The material flow concept of the new KION RDC CE combines permanently installed, fully automated systems - including a 30-meter-high high-bay warehouse, a multishuttle system and continuous conveyor technology - with flexible, mobile autonomous robots (AMRs) and manually operated industrial trucks. © Linde Material Handling

